![[Girder-Design-for-Efficient-Defence-Product-Painting.webp]]
**Client:** EPTEC
**Industry:** Defence Manufacturing
**Service:** Industrial Design & Engineering Drafting
**Outcome:** Fully developed design concept (not implemented)
EPTEC, a leading defence product manufacturer, engaged KEVOS® to streamline their painting process for large, complex components. Their core objective was clear:
**Reduce manual handling, increase efficiency, and introduce mobility between painting stages through a purpose-designed girder system.**
#### **Challenges**
EPTEC’s existing painting workflow presented several operational issues:
- **Heavy manual handling** of large defence components, increasing labour hours and safety risks.
- **Static painting setups**, requiring products to be manually transported between stations.
- **Inefficient workflow**, leading to delays, bottlenecks, and inconsistent throughput.
These challenges highlighted the need for a robust, mobile, and adaptable handling system.
### **Our Solution**
KEVOS® developed a **modular girder system** engineered specifically for EPTEC’s production environment.
![[GIRDER.webp]]
#### **Key Features of the Design**
**1. Modular Configuration**
- Easily assembled and disassembled
- Adjustable to suit varying component sizes and shapes
- Provides long-term flexibility for EPTEC’s diverse product mix
**2. High-Strength, Stable Structure**
- Engineered to support significant loads
- Ensures accuracy and safety throughout the painting process
**3. Rail-Based Mobility System**
- Smooth movement between painting booths
- Dramatically reduces manual transport
- Minimises workflow downtime and handling errors
#### **Design Process**
Our approach combined practical industry insight with advanced engineering methods:
1. **Site assessments & stakeholder interviews**
- Mapped pain points and workflow inefficiencies
2. **Concept development & refinement**
- Multiple design options reviewed with EPTEC
3. **Iterative prototyping**
- Progressive improvements based on operational feedback
4. **Virtual simulations**
- Structural, mechanical, and mobility performance validated under real conditions
#### **Outcome**
Although the project did not proceed to fabrication due to **budget limitations and internal stakeholder timing**, the final design was **well-received** by EPTEC.
The girder system stands as a strong example of our capability to deliver **innovative, practical, and industry-ready solutions** for complex manufacturing challenges.
The completed concepts remain ready for future implementation as EPTEC’s operational needs evolve.
#### **Why This Matters**
This case study demonstrates KEVOS® commitment to:
- Improving industrial efficiency
- Enhancing safety and workflow design
- Delivering adaptable engineering solutions
- Adding value—even when projects pause before implementation
Thoughtful design endures. Even without immediate construction, the work completed provides EPTEC with a scalable blueprint for future investment.
**Let’s Work Together**
If your organisation needs expert engineering design or drafting support, we’re here to help.
**KEVOS® provides practical, highly technical solutions tailored to industrial manufacturing environments.**
**Contact us today** to discuss how we can collaborate on your next project.